Stakis Technik 2018.1: Complete Installation and Workshop Guide
Key specifications (common to most 20181 variants):
Conclusion: Mastering the 20181 Install Work
2. Pre-Installation Preparation
Multi-Brand Coverage
: Access technical data for a wide variety of vehicle makes and models. stakis technik 20181 install work
- Power off completely – Lockout/tagout the control panel.
- Strip wires 8mm – Do not expose excess copper.
- Use ferrules – For stranded wire, crimp insulated ferrules. Bare stranded wire under screw terminals causes high resistance and heat.
- Connect protective earth (PE) – If the 20181 has a PE terminal (often marked with the earth symbol), connect it to the panel ground busbar. If no terminal, ensure the DIN rail is grounded.
- Wire inputs first (sensors, buttons).
- Wire outputs second (contactors, lights, valves).
- Wire power supply (A1, A2) last – This prevents accidental energization while handling other terminals.
- Some packages include a PC-side app (
StakisControlCenter_v20181.exe).
- Install as administrator.
- Do not connect the device to internet – these tools often "phone home".
Labor Estimates
: Contains "Repair Times" modules to help workshops calculate labor costs efficiently. Stakis Technik 2018